Solar/Photovoltaic Bileća for sale Bosnia-Herzegovina | 132 MWp hybrid solar and wind power project in Bosnia

132 MWp hybrid solar and wind power project in Bosnia 

reedb-id: 1295424
#Solar #Photovoltaic #ForSale #Bileća #RepublikaSrpska #ОпштинаБилећа #OpštinaBileća #BosniaHerzegovina
Solar/Photovoltaic Bileća for sale Bosnia-Herzegovina | HybridEnergy RenewableInvestment in Bosnien
HybridEnergy RenewableInvestment in Bosnien
Solar/Photovoltaic Bileća for sale Bosnia-Herzegovina | HybridEnergy RenewableInvestment in BosnienSolar/Photovoltaic Bileća for sale Bosnia-Herzegovina | SolarAndWind in Bosnien zu verkaufenSolar/Photovoltaic Bileća for sale Bosnia-Herzegovina | QR-CODE ...

Solar/Photovoltaic for sale
€ 121 000 000 (≈ US$  137 855 000) 
BA-89230 Bileća
Republika Srpska, Bosnia-Herzegovina

Contact owner

 Info >>>
 
 E-mail
  eMail
 All offers of the estate supplier
Areas
Property321,23 acre
Description
BiH (1) is a unique hybrid project in southern Bosnia & Herzegovina that combines solar energy (96 MWp/80 MWac) and wind power (36 MW). The project is being developed through an SPV in Banja Luka and is based on a 27-year concession for more than 130 ha of land, with an option to extend up to 50 years.

As of August 2025, ~85% of the development has been completed. Key approvals such as the regulatory plan, site, environmental, and grid connection permits have already been secured. The building permit for the PV plant is expected by September 2025, and for the wind farm and substation by Q1/2026 at the latest. This means that the project will reach RTB status by early 2026 at the latest.

The estimated total investment is EUR 121 million with expected annual net revenues of EUR 14.9 million. An optional BESS integration (40–50 MWh) is also prepared.

#HybridEnergy #RenewableInvestment #SolarAndWind #EnergySecurity #BalkanEnergy
Position
#OpštinaBileća/OpštinaBileća
Municipality of Bileća, southern Bosnia and Herzegovina
Close to the border with Croatia and Montenegro
Good infrastructure and connection to main power lines
130 ha project area, secured by concession
Fittings
Total capacity: 132 MWp / 116 MWac
Solar PV: 96 MWp / 80 MWac
Wind farm: 6 × 6 MW = 36 MW
Grid connection: 400 kV line to the transmission grid
Optional BESS: 40–50 MWh, location already secured
Technologies:
* PV: Tier 1 modules, Sungrow inverters
* Wind: Goldwind GW165 6.0 MW
* Transformers available from EU/Turkey/China
Concession: 27 years + extension option up to 50 years
Other
Development costs: EUR 17 million
Expected annual production:
Solar: ~140 GWh (0.35–0.40% degradation)
Wind: ~102 GWh
Total yield: ~242 GWh per year
Planned completion: Q2 2027 (COD)
Government guarantees purchase of all electricity produced, no known curtailment risks.
All grid reinforcements and fees already calculated in EPC.
Disclaimer
Der Autor übernimmt keinerlei Gewähr hinsichtlich der inhaltlichen Richtigkeit, Genauigkeit, Aktualität, Zuverlässigkeit und Vollständigkeit der Informationen. Haftungsansprüche gegen den Autor wegen Schäden materieller oder immaterieller Art, welche aus dem Zugriff oder der Nutzung bzw. Nichtnutzung der veröffentlichten Informationen, durch Missbrauch der Verbindung oder durch technische Störungen entstanden sind, werden ausgeschlossen. Alle Angebote sind unverbindlich. Der Autor behält es sich ausdrücklich vor, Teile der Seiten oder das gesamte Angebot ohne gesonderte Ankündigung zu verändern, zu ergänzen, zu löschen oder die Veröffentlichung zeitweise oder endgültig einzustellen.
load datadata load ...